Construction Services — Additions & Renovations
Room Additions & Renovations Fort Lauderdale
Room additions, garages, and structural changes engineered and permitted to code across Broward, Miami-Dade & Palm Beach counties.
★★★★★ 4.8
GOOGLE · 106 REVIEWS
Local & Family Owned
SINCE 2013
ShingleMaster
CERTAINTEED, GAF & IKO SHINGLES
GAF Certified
CERTIFIED ROOFING CONTRACTOR
Licensed
CCC1331129 / CBC1259476
No Deposit Required — You Only Pay When You’re Satisfied
What's Involved In Adding A Room To My Home?
A room addition involves structural design, engineering, county permitting, and construction that ties seamlessly into your existing home — we manage the full process so the new space matches your home’s structure and code requirements.
What's Included
- Room and garage addition planning and construction
- Structural engineering coordinated for your project
- Permit filing and county inspection sign-off
- Construction that integrates cleanly with your existing structure
Additions & Renovations — In Depth
Room Additions & Zoning Setback Requirements
Every room addition has to comply with local zoning setback rules, lot coverage limits, and height restrictions before a permit will be issued. We review your property’s zoning constraints early in planning so the addition you want is the addition that will actually get approved.
Foundation & Structural Tie-In Considerations
Tying a new addition’s foundation and roofline into an existing structure correctly is the difference between an addition that looks and performs like it was always there and one with visible seams, drainage issues, or structural cracking over time. We engineer the tie-in points — not just the new square footage — as part of every addition project.
Matching Existing Rooflines, Siding & Finishes
A well-executed addition matches the home’s existing roof pitch, siding profile, and trim details closely enough that it reads as original construction rather than a visibly bolted-on extension. We source matching or close-match materials and flag upfront when an exact match isn’t available so there are no surprises.
Permitting Timeline For Additions vs. Interior Renovations
Room additions generally require a longer permitting process than interior renovations because they involve structural, electrical, plumbing, and sometimes survey review by the county. We build realistic permitting timelines into your project schedule from day one rather than estimating only the construction phase.
Common Questions
Additions & Renovations, Answered Directly
Customer Reviews
What Fort Lauderdale Residents Are Saying
★★★★★ 4.8 out of 5 · 106 Google reviews
“Ricketts handled our roof repair after a bad storm and made the whole process easy — showed up when they said they would, explained what was actually wrong, and kept the property clean every day. Would recommend them to anyone in South Florida.”
A RICKETTS CONSTRUCTION CUSTOMER
Get A Free Quote