Construction Services — Major Remodels

Kitchen & Bathroom Remodeling Fort Lauderdale

Kitchens, bathrooms, and whole-home renovations planned and built with one point of contact, from design through final walkthrough.

★★★★★ 4.8

GOOGLE · 106 REVIEWS

Local & Family Owned

SINCE 2013

ShingleMaster

CERTAINTEED, GAF & IKO SHINGLES

GAF Certified

CERTIFIED ROOFING CONTRACTOR

Licensed

CCC1331129 / CBC1259476

No Deposit Required — You Only Pay When You’re Satisfied

What Should I Expect From A Remodel Timeline?

Timelines vary by scope — a bathroom remodel typically takes a few weeks, while a full kitchen or whole-home renovation can take several months. We give you a specific, written timeline as part of your estimate.

What's Included

Remodeling — In Depth

Typical Kitchen & Bathroom Remodel Timelines

A full kitchen remodel typically runs 4-8 weeks from demolition to final walkthrough, while a bathroom remodel runs 2-4 weeks, depending on whether plumbing or electrical is being relocated. We give you a written timeline at the start of the project and flag delays as soon as we know about them — material backorders and inspection scheduling are the most common causes.

Design-Build vs. Hiring Separate Designers

A design-build remodel means one team handles both the design decisions and the construction, which keeps the budget and the design intent aligned throughout the project. Separating design and construction into two contracts can produce a beautiful plan that goes over budget the moment it meets real-world construction costs.

Living In Your Home During A Remodel

Most kitchen and bathroom remodels can be completed while you continue living in the home, though a kitchen remodel typically means using a temporary setup for cooking during the demolition and rough-in phases. We plan the work sequence to minimize how long you’re without a functioning kitchen or bathroom.

Selecting Materials & Fixtures On Budget

Cabinetry, countertops, tile, and fixtures typically represent the largest swing in a remodel budget. We help you prioritize where higher-cost materials make the most visible and durable difference — countertops and flooring generally outlast trend-driven finish choices.

Common Questions

Major Remodels, Answered Directly

We work with your vision and plans and manage the full construction process — talk to us about your specific project scope.
Timelines depend on scope, but most kitchen remodels take several weeks to a few months from start to finish.
Many remodels involving plumbing, electrical, or structural changes require a permit — we handle that filing as part of the project.
In most cases yes, though it depends on the scope — we’ll walk through what to expect for your specific project.
Happy family in front of their home after a Ricketts Construction roofing project

Customer Reviews

What Fort Lauderdale Residents Are Saying

★★★★★ 4.8 out of 5 · 106 Google reviews

“Ricketts handled our roof repair after a bad storm and made the whole process easy — showed up when they said they would, explained what was actually wrong, and kept the property clean every day. Would recommend them to anyone in South Florida.”

A RICKETTS CONSTRUCTION CUSTOMER

Get A Free Quote

Plan Your Remodel

Scroll to Top
Scroll to Top